Preparation & Site Constraints

 
28.jpg

Once a project is on site, the unexpected can happen - especially when dealing with an old building. So having a contingency is important. We would recommend setting aside 10 - 15% of the overall budget to cover the costs of unforeseen issues during the build phase.

Here are some of the most common examples that can increase costs:

  • Are you intending to live in the house during the works?

  • Are you extending the rear of a Victorian terrace property with the access limited through a narrow hallway?

  • Do you need to re-route the drainage or install a new manhole?

  • Do you need to move a utility meter or a fit a new boiler?

  • Do you need to demolish an existing extension first?

All of these things naturally will add complexity to the build and would therefore tend to push up the overall cost. But don’t worry, we have seen it all before and we can help make the process smooth and stress-free. If you have specific questions about your project contact us for more information.

 
 
 
Previous
Previous

How an Architect Can Help…

Next
Next

Renovation Costs: Kitchens and Glazing